Full remodels
A kitchen built for the room you actually have.
Most LA kitchens are not blank slates. There is a wall that cannot move, a window in the wrong place, a building with an opinion about plumbing. We plan around what is really there, then build to it.

01 / What a full remodel covers
Everything in the room, from one team.
Layout and planning, cabinetry (stock programmes or built in our own shop), countertops, backsplash and tile, flooring, lighting and electrical, plumbing relocation where the building allows it, and permits where they are required.
02 / Two very different jobs
Be honest with yourself about which one you want.
Same layout, new everything you can see
Cabinets and stone replaced, plumbing and electrics stay put. The fastest route to a kitchen that looks new, and the cheapest by a wide margin.
Layout changed
Walls, islands, plumbing, sometimes permits. More planning, more time, more money, and the only option if the room itself is the problem.
03 / What drives the price
Three things set the number.
Whether the layout moves
And with it, whether the work needs permits. Keeping walls, plumbing and electrics where they are is the single biggest saving.
Stock cabinetry or a custom build
Stock programmes cost less than a kitchen built for your room in our own shop.
Which stone you choose
Quartz, quartzite, granite, marble and porcelain are not close to each other in price.
Your quote itemises all three. We do not price over the phone.
04 / On timelines
Days for doors and stone. Weeks for a custom build.
A cabinet-and-countertop replacement is a matter of days on site. A custom build is a matter of weeks, because it is being made for your room. We do not publish approximate durations: your dates come with your quote, and a verified timeline from a comparable finished project is available on request.


Start it
Book the measurement.
Someone comes to the kitchen with a tape measure. Everything after that rests on real dimensions, not a phone estimate.